If your front door is warped, draughty, hard to lock or simply tired, replacing the exterior door is a bigger decision than it looks, and this page is for homeowners deciding how the job works and what to check before they order. Replacing a front door is usually a half-day job once the door is made: the guides we read give 2 to 5 hours for a like-for-like swap, longer if the frame, size or brickwork changes. What decides the paperwork is whether the frame comes out. A new door and frame in England has to meet 1.4 W/m²K or a Doorset Energy Rating of Band B, with a certificate from a competent person scheme such as FENSA or CERTASS.

Takes about two minutes. Installers pay us, so it is free for you.

Typical like-for-like fit
2 - 5 hoursMyJobQuote guide; BestBuilders says 3 to 5
U-value limit
1.4W/m²K for a new door and frame in England
Competent person schemes
6listed by GOV.UK for window and door replacement
New Part L edition starts
24 Mar 2027England; the door limits stay the same

Sources: MyJobQuote, new front door cost, last updated 5 November 2026; BestBuilders, external door fitting cost, last updated 29 August 2026; Approved Document L, Volume 1, 2021 edition with 2023 amendments, Table 4.2, and the 2026 edition; GOV.UK, competent person schemes, updated 17 September 2026.

Updated · By Simon Doyle

In short

  • A like-for-like swap takes 2 to 5 hours in the guides we read. A new frame, a different size or brickwork repair makes it longer.
  • Ask for a survey before the door is ordered: measuring the frame, checking for uneven walls and rot, and agreeing swing, lock position and threshold. See the checklist.
  • A new door and frame must meet 1.4 W/m²K or Doorset Energy Rating Band B in England. A door hung in the existing frame is not treated as a new controlled fitting.
  • Use an installer on a competent person scheme such as FENSA or CERTASS, or building control has to approve the work. You receive a certificate when it is done.
  • Flats, conservation areas and listed buildings each add a check before you order. See what to ask the council.
On this page (10)
  1. What is involved
  2. The survey
  3. Frame and threshold
  4. Materials
  5. Regulations and certificates
  6. Planning
  7. What to ask
  8. The bottom line
  9. Comparing quotes
  10. FAQs

What Replacing A Front Door Involves

A front door replacement is three things in order: a measure-up, a made-to-measure door and frame, and a fitting day. Most of the waiting is for the door to be made, and most of the surprises come at the fitting, when the old frame comes out and the brickwork around it is exposed.

Repair or replace? A door that has suffered weather damage is not always a door to replace. A sticking leaf can often be fixed by adjusting the hinges, and a double glazed panel that has misted is a failed sealed unit, which can sometimes be replaced without replacing the door. Replace the whole door when the slab or frame has rotted, the door will no longer lock securely, or you want a different style or the energy rating of a new door and frame. Ask an installer to say in writing whether the quote is for a new door or a repair.

The stages of a front door replacement
StageWhat happensHow long, in the guides we read
SurveyThe fitter measures the door and frame, checks for uneven walls or decay and agrees swing direction, lock position, threshold and sealingBefore ordering
Strip outThe old door, fixings and frame come out, ideally without damaging the brickwork or plaster around themPart of the fitting day
FitThe new frame is set and fixed, the door hung and the locks alignedTypically 2 to 5 hours (MyJobQuote); 3 to 5 for a straightforward like-for-like swap (BestBuilders)
FinishGaps are insulated and sealed, trims and weatherproofing finished, and the latch, lock, hinges and handle testedPart of the fitting day
Longer jobsA different size, a new frame or lintel, no existing letterbox or repairs to brickwork or plasterLonger than the usual window (MyJobQuote); a full day or more if the opening is resized or needs a new lintel (BestBuilders)

Source: MyJobQuote, new front door cost, last updated 5 November 2026; BestBuilders, external door fitting cost, last updated 29 August 2026. Times are each guide's own estimate, not Switchable's.

An empty front door opening seen from a hallway with the old door removed, bare brick reveals, a new pale timber frame and a spirit level on the floor
With the old door out, the fitter can see the brickwork, cill and frame that the survey should have flagged.

For what each stage costs, see our new front door cost guide. This page covers how the job works and what to check.

The Survey: What The Fitter Should Check

The survey is where a front door job goes right or wrong, because the door is made to the size measured. A fitter who quotes from a photograph or a phone call is guessing at the things that cost time on the day. Before you order, expect the fitter to look at and write down:

  • The opening: width, height and whether the walls and cill are square, level and sound.
  • The frame: whether it is solid, square and in good condition, or whether it needs replacing.
  • Hand, swing and lock position: which way the door opens and where the handle and lock sit.
  • The threshold: its height and type, and how the new one meets the floor inside and the step outside.
  • Extras: letterbox, number of locks, glazing, side lights, and what happens to the old door.

If the survey finds rot in a timber frame or an uneven opening, that changes the job, so ask for any change to the scope to be written into the quote before you pay a deposit.

Frame And Threshold

Keeping the existing frame is only sensible if it is solid, square and in good condition. If it is not, a new frame goes in with the door, and that is when the energy limits and the certificate come into play.

The threshold is the strip at the bottom of the frame. If your home was built since 1999, Planning Portal says that when you replace the main entrance door, the threshold must stay level, otherwise access would be worse than when it was built. So a raised threshold is a reason to ask questions, not a detail to leave to the day.

A low-profile aluminium threshold with a white sealant line under a white uPVC door, set on a brick step
A well-fitted threshold is low, sealed along its edge and meets the step cleanly.

Approved Document L adds that a new door and frame should be draught-proofed and that insulated cavity closers should be installed where appropriate. Ask the quote to say which threshold system is included and what height it sits at.

Front Door Materials: uPVC, Composite, Timber And Aluminium

Prices for each material are in our front door cost guide, so this table sets out the other differences. A uPVC front door is the one most people price first, and the table shows what it does and does not give you.

Exterior door types. A modern exterior door is usually one of four builds: uPVC front doors, composite front doors, wooden doors and aluminium doors. Aluminium frames are normally made with thermal breaks, an insulating strip between the inner and outer metal, so the metal does not carry cold straight through. Ask for the thermal performance of the door as fitted and not just the material, and ask what range of colours, panel designs and traditional or contemporary styles is offered, because the same material comes in very different looks.

Glazing and locks. Many front doors have a glazed panel. Ask whether the glass is double glazing or triple glazing, whether decorative glazing is included in the price, and that the glass is toughened or laminated. For security, ask which locking systems are fitted and whether the lock is multi-point, and keep the PAS 24 certificate for the door, frame and lock together.

Energy bills. A door that meets the 1.4 W/m²K limit and is draught-proofed will leak less heat than a worn one, and insulation round the frame stops gaps. None of the sources we read gives a bill saving for a front door, so we do not quote one: compare the rated figure instead.

Front door materials compared
MaterialUpkeep and durabilityWorth knowing
uPVCTough, resists rot and swelling and needs minimal cleaning, but colour can fade or discolour and painting may void the warrantyCertification to PAS 24 is possible on uPVC, as it is on any material, but has to be shown by a certificate for the door
CompositeLow upkeep from a factory finishThe build varies by maker: see our composite doors guide
TimberOak needs regular upkeep to stay weatherproof and can be stained or repainted; softwood pine does not last as long as hardwood and dents more easilyTimber doors had a looser energy limit of 1.8 W/m²K until 14 June 2023; the full 1.4 now applies
AluminiumLow maintenance, strong and weather-resistant with powder-coated finishesPriced at the top of the range in the guide we read

Source: MyJobQuote, new front door cost, last updated 5 November 2026, for upkeep points; Approved Document L, Volume 1, Table 4.2, for the timber door note; BSI, enhancing security for windows and doorsets with PAS 24 for PAS 24 and materials.

For a head-to-head of the two most common choices, see our composite vs uPVC door guide. Whichever you choose, the energy limit is the same and the security standard is not tied to a material, so compare the rating, the certificate and the guarantee of the exact door.

Building Regulations, FENSA And CERTASS

In England, building regulations have applied to replacement glazing since 1 April 2002, and external doors are controlled fittings, so a new door and frame must meet an energy standard. Installers on a competent person scheme can sign the work off themselves and you receive a certificate. Otherwise a building control body has to approve it. GOV.UK lists six schemes for window and door replacement: Blue Flame, CERTASS, NICEIC (Certsure), FENSA, NAPIT and ASSURE (GOV.UK, competent person schemes, updated 17 September 2026).

Rules for a new front door in England
PointWhat the rule says
Energy limit1.4 W/m²K or Doorset Energy Rating Band B or better; Band C if more than 60% of the internal face is glazed
Draught-proofingThe unit should be draught-proofed, with insulated cavity closers where appropriate
Door in the existing frameReplacing a door in its existing frame is not providing a controlled fitting, and such work does not need to meet the energy efficiency requirements
EvidenceA Doorset Energy Rating from a quality-assured certification scheme can be accepted by building control as evidence
Fully glazed doors in older homesIf a fully glazed door cannot meet the table because of the building's character, the centre pane should not exceed 1.2 W/m²K, or single glazing should be supplemented with low-emissivity secondary glazing
New editionThe 2026 edition of Approved Document L takes effect in England on 24 March 2027 for building work that is not higher-risk. Its door limits are the same

Source: Approved Document L, Volume 1, 2021 edition incorporating 2023 amendments (paragraphs 4.10, 10.3, 10.4, 10.6 and Table 4.2) and the 2026 edition (Table 3.2, paragraphs 10.3 to 10.6), read 26 November 2026.

FENSA or CERTASS? Both are authorised schemes, so either certificate shows the installer self-certified the work. FENSA says its installers should provide a certificate when the job is done, and its homepage for homeowners has a search by postcode, company name or FENSA ID. CERTASS directs homeowners to certifiedcompetent.co.uk to find a certified installer and order a certificate. If the installer is not registered, FENSA warns you are likely to pay for a building control inspection, and that if it finds a fault you should budget a few hundred pounds, so make sure the quote says who puts it right.

Source: FENSA, homeowners, read 26 November 2026. The "few hundred pounds" is FENSA's own estimate.

Planning, Conservation Areas And Listed Buildings

In England you do not usually need planning permission for new doors that look similar to the ones they replace. That is where the freedom ends in some homes, so check which of these applies to yours before you choose a door.

  • A standard home

    A door of similar appearance usually needs no planning permission, and the building regulations route above applies.

    Planning Portal

  • A conservation area or Article 4

    A council can withdraw the freedom to change doors with an Article 4 direction, and designated areas can have extra limits. Ask the council what a replacement must look like before you order.

    Planning Portal

  • A listed building

    You need listed building consent for significant works, and replacing a front door can be one, so ask the council. Do not order a door until you have its answer in writing.

    Planning Portal

  • A flat or leasehold home

    You may need the landlord's or management company's permission, and a flat's entrance door may have to be a fire door, so ask the freeholder first.

    Planning Portal, GOV.UK

A painted forest green panelled front door under a fanlight on a Georgian terrace with stone steps and black railings
On a Georgian terrace, the door is part of what a conservation area exists to protect.

For a flat, GOV.UK's fire door guidance says a resident who wants to change a front door should do so with the responsible person's agreement, and that a resident who replaces a fire-resisting door with a non-fire-resisting one should confirm the new door is fire-resisting, fitted by a competent person and supported by its technical information. The guidance was updated on 8 August 2025.

Front Door Installation: What To Ask Installers

Switchable is independent of every maker and price guide named on this page and is not paid by any of them for it. We compare and introduce; we do not fit doors. Our method is on the how we review page. When you compare quotes, ask each installer:

  • Will you survey and measure before ordering, and put any change to the scope in writing?
  • Is the quote itemised: door, frame, threshold, removal and disposal, trims, locks, handle, letterbox and sealing?
  • Is the frame being replaced, and if not, why is the existing one sound?
  • Which threshold, and at what height, especially if the home was built since 1999?
  • Which competent person scheme are you on, and will I receive the certificate when the job is done?
  • What is the lock, and is there a PAS 24 certificate for the door, frame and lock together?
  • What guarantees come with it, and is the installation guarantee insurance-backed? FENSA says this became mandatory for its installers in 2014.
  • Do you carry public liability insurance, and can I see photos of similar jobs?
  • Is my door a fire door, if I live in a flat, and will you supply the certificate?

The Bottom Line

Replacing a front door is a quick fitting once the door is made, 2 to 5 hours in the guides we read, but the quality of the job is decided before then. A proper survey, an honest answer on the frame and threshold, and a competent person certificate matter more than the material you pick. A new door and frame in England has to meet 1.4 W/m²K or Band B whichever material you choose, and from 24 March 2027 a new edition of Approved Document L applies with the same door limits.

Check the planning position first if the home is a flat, in a conservation area or listed, then compare quotes for the same specification: same size, same glazing, same lock, same threshold. Our front door cost guide has the prices.

Compare window and door quotes

Sources

Checked 26 November 2026.

On this page

  1. What is involved
  2. The survey
  3. Frame and threshold
  4. Materials
  5. Regulations and certificates
  6. Planning
  7. What to ask
  8. The bottom line
  9. Comparing quotes
  10. FAQs

How To Compare Quotes

Get at least three quotes and compare them line by line. Prices for the same job can differ a lot.

  • A price for each window and door. One total hides where the money goes, so ask for every window and door on its own line.
  • The same specification on every quote: frame material, glass, energy rating, and whether the old frames are removed and made good.
  • A competent person scheme certificate. Ask whether the installer is registered with Fensa, Certass or another scheme and will certify the work, and whether the 20% VAT is in the price.

How Switchable works

  1. Check. Tell us your postcode and a few details about your home. It takes about two minutes.
  2. Compare. Local installers who cover your area get in touch with quotes.
  3. Switch. Go ahead with the quote that suits you, or none at all. There is no obligation.

Switchable is free to use. Installers pay us for each introduction.

Front Door Replacement: Your Questions.

Still unsure?

0151 453 1765

Or email info@switchable.co.uk and we will get back to you.

How long does it take to replace a front door?

The guides we read give 2 to 5 hours for a typical swap, and 3 to 5 for a straightforward like-for-like one. A different size, a new frame or lintel, or repairs to brickwork and plaster can take a full day or more.

Do I need building regulations approval to replace a front door?

In England a new door and frame is a controlled fitting and has to meet 1.4 W/m²K or Doorset Energy Rating Band B. An installer on a competent person scheme such as FENSA or CERTASS can certify it, otherwise a building control body has to approve it.

Can I replace just the door and keep the frame?

Yes, if the frame is solid, square and in good condition. Approved Document L says replacing a door in its existing frame is not providing a controlled fitting, so the energy standard does not apply to that work.

Do I need planning permission for a new front door?

Usually not in England if the new door looks similar to the old one. A listed building needs listed building consent, and an Article 4 direction or conservation area can add limits, so ask your council first.

Is a uPVC front door cheaper than the other materials?

In the price guides we read, yes. Our front door cost guide sets out each guide's figures by name. A uPVC door can be PAS 24 certified, but the certificate has to be shown for the exact door.

Does a front door threshold have to be level?

Planning Portal says that when you replace the main entrance door of a dwelling built since 1999, the threshold must stay level. Ask the installer which threshold system is included and its height.

What if my installer is not registered with FENSA or CERTASS?

You will likely need a building control inspection, and FENSA says to budget a few hundred pounds if it finds a fault. Ask the installer to put in writing who will put it right.

Can I change the front door of my flat?

Check your lease and ask the freeholder. GOV.UK's fire door guidance says a resident should change a flat's entrance door with the responsible person's agreement, using a competent person, and that the new door should be fire-resisting.

Should I repair or replace my front door?

Repair is worth trying when the problem is a sticking leaf or a failed sealed glass unit. Replace the door when the slab or frame has rotted, it no longer locks securely, or you want a new style or energy rating. Ask the installer to say in writing which job the quote covers.

What types of exterior door can I choose?

uPVC, composite, timber and aluminium are the four builds you are likely to be quoted for. The energy limit and the security standard are the same whichever you choose, so compare the rating, the certificate and the guarantee of the exact door.